Escort travel | jiaozuo-liuzhou downlink rail “bone surgery”

2022-05-22 0 By

During the return of the Spring Festival Travel rush, on the railway line crossing the junction of Henan and Hubei, Nanyang Engineering section of Zhengzhou Bureau Group Co., Ltd. of China Railway organized workers to carry out rail “bone-setting operation” on the seamless track of jiaoliu downward line.At 18 o ‘clock in the evening of February 14, the skylight order was issued, 12 line maintenance workers and 8 professional welding repair personnel who stick to the front line entered the protective net with spare parts and rushed to the operation site, to replace, repair and repair the damaged rail with a length of 9 meters at 469 kilometers of Jiaoliu Line, and eliminate the hidden danger of railway equipment in time.The cold wind was blowing and the welders were dancing.Wind “heat” in the field worker, after 120 minutes skylight point of time, hand in hand through excision injury rail, new rail replacement, component installation, precision adjustment, welded rail grinding all operation scheme, test verification procedures, to the orbits of the repair regulation, ensure the quality of line equipment, fully protect travel the road to return.